| December 4, 2008 |
|
Rio Cristal Zinc Successfully Renegotiates Concession Agreement |
|
| Read more... |
| October 16, 2008 |
|
Rio Cristal Zinc Hires Barry Kaplan Associates For Investor Relations Services |
|
| Read more... |
| October 15, 2008 |
|
Rio Cristal Zinc Completes Drilling of High-Grade Zinc Target
|
|
| Read more... |
Get the Flash Player to see this player.
Flash Image Rotator Module by Joomlashack.
Image 1 Title
Image 2 Title
Image 3 Title
Image 4 Title
Image 5 Title
| Summary |
|
|
|
Three exploration projects have currently been identified within the Charlotte Bongará claim block: Cristal, San Jose and Florida. Cristal has multiple drill target areas and we plan to identify other targets for San Jose and Florida during the 2008 exploration campaign.
CRISTAL PROJECT
The Company’s initial exploration project is at Cristal where multiple zinc oxide and zinc sulphide outcrops have been observed over an area estimated to be 2,000 meters by 1,000 meters. Zinc oxide outcrops at Cristal appear to be similar to the high grade zinc found at Cementos Pacasmayo’s Bongará Project. The Bongará Project is located 6km along strike from the Cristal prospects. Additionally, zinc sulphide-bearing outcrops suggest possible deep zinc sulphide mineralization at Cristal. One particular feature observed at Cristal is the presence of a sulphide-bearing ore with a zinc oxide envelope. Geochemical sampling and detailed geological mapping at Cristal target areas are in progress and drilling commenced at Cristal in mid-2008. SAN JOSE and FLORIDA PROJECTS The San Jose exploration project, located approximately 10km southwest of the Cristal project, was identified based on stream sediment sampling. San Jose consists of mineralization hosted within the Chambará Formation, which is “favourable” to Mississippi Valley-type mineralization. At the Florida project, targets follow the same structural control and stratigraphy observed at Votorantim’s Florida Canyon advanced exploration project. Exploration at the San Jose and Florida projects is underway. |
|||
| < Prev | Next > |
|---|